LIVE - LEARN - WORK - PLAY

Grantee Blog 2020

Greenhouse Remodel: Before & After

This once dilapidated greenhouse had new life breathed into it and is well on its way to becoming an outdoor classroom for the students at Bridgeton High School. All the siding and roofing materials were replaced, the brick was painted a modern black, and a shade cloth added to help control the temperature for plant growth.  Old radiators and other miscellaneous items were removed from inside.  Next on the list is replacing the wooden slated in the concrete beds, filling the beds with soil, installing propane heaters, and laying down black matting to prevent weeds from growing.

 

 

About the Grantee

Bridgeton Board of Education

The Mission is to provide multiple pathways for students to attain the NJ Student Learning Standards and to meet the needs of our diverse student population. All students will be provided with the opportunity and resources to succeed through the creation of safe learning environments, which will enable students to graduate from high school and become productive member of a global community.